logo
제품 소개Pp 띠 생산 라인

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

제가 지금 온라인 채팅 해요

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding
Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

큰 이미지 :  Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

제품 상세 정보:
원래 장소: 중국
브랜드 이름: CHUQI
모델 번호: CQ-SPP120-6
결제 및 배송 조건:
최소 주문 수량: 1세트
포장 세부 사항: 나무 상자
배달 시간: 60일
지불 조건: 티/티
공급 능력: 10세트

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

설명
수분 제거 단계: 2 1단계 전력: 4kw
2단계 전력: 7.5kw 단위 수: 각 4개
작동 원리: 고압 공기 흐름 결과: 완전히 건조됨
위치: 탱크 후, 와인딩 전
강조하다:

PP strapping band water removal system

,

Two-stage drying system for strapping

,

High-pressure airflow drying equipment

Two-Stage Water Removal System for Dry Product Before Winding
Product Overview

Residual moisture on the tape surface, if carried into subsequent embossing or winding processes, can cause unclear embossing, roll adhesion, or mildew. This production line is equipped with a two-stage water removal system to ensure complete drying before further processing.

System Operation

The first water removal device, located after the first cooling tank, uses a high-pressure centrifugal fan (4KW) with 4 suction pipe sets to initially remove bulk water. The second water removal device, at the outlet of the secondary cooling tank, features a high-pressure centrifugal fan (7.5KW) and 4 water removal units for efficient, fine drying. The two-stage system works together to ensure the tape entering the embosser and winder is completely dry.

Main Specifications
  • First water removal device: 4 suction pipe sets, high-pressure centrifugal fan 4KW
  • Second water removal device: 4 water removal units, high-pressure centrifugal fan 7.5KW
  • Working principle: High-pressure air blowing across top and bottom surfaces
  • Installation positions: After first tank, after secondary tank
Technical Parameters
Item First Water Removal Second Water Removal
Number of units 4 suction pipe sets 4 water removal units
Fan power 4 KW 7.5 KW
Fan type High-pressure centrifugal High-pressure centrifugal
Target 6 PP strands 6 PP strands
Installation position After first cooling tank Outlet of secondary cooling tank
Frequently Asked Questions
Why are two stages of water removal needed? Isn't one enough?
After the first tank, a large amount of water adheres to the tape surface; one stage can remove about 80%. However, the remaining water film still needs strong blowing. The second stage uses a more powerful fan to ensure complete dryness, especially adapting to reduced water splash at high speeds.
Will the airflow from the water removal units blow the tape off course?
The design uses a fan-shaped airflow with adjustable angle, directed tangentially to the tape surface, primarily generating shear force to peel off the water film, with minimal impact on the tape's running path. Proper adjustment prevents wandering.
Are the fans noisy?
High-pressure centrifugal fans do generate some noise, but the equipment includes noise reduction measures and protective covers. For noise-sensitive environments, optional additional sound enclosures or remote fan installation can be provided.

연락처 세부 사항
Jiaxing Chuanqi Machinery Equipment Co., Ltd.

담당자: Mr. Alex

전화 번호: 86-18858326160

회사에 직접 문의 보내기 (0 / 3000)